OngoingMinistry of Road Transport & Highways (MoRTH)
Teesta Basin Landslide Slope Stabilization & Bio-Engineering on NH-10 Corridor
East & South Sikkim (Gangtok, Pakyong, Namchi)Timeline: 2023-08-01 - 2025-06-30
Integrated soil nailing, hydro-seeding, gabion wall construction, and geological catch-fencing along critically vulnerable slope failures on the national highway.
Certified Community Resilience Initiative


